久久久久久久久久久国产精品|在线中文字幕亚洲日韩首页|亚洲国产午夜精彩无码福利|精品国产免费看久久久

Hello! Welcome to the Shenzhen ZhongAn Traffic Technology Co., Ltd official website!

24h Service Hotline:

13316950296

About US
Contact US

Service Hotline

86-0755-23020833

Contact: 

Manager Jiang  86-13316950296
Manager Xia     86-13169900590

Address:5/F, D2 Building,D zone, New Century co-prosperity Industrial Park, No. 2 Shihua Road, Shillong community, Shiyan Street,Baoan District, Shenzhen city, China 
Tel: 86 0755--23020833
Fax: 86 0755--23096233
URL: www.6164v.com

You are here:Home > About US > Common problem > Installation of traffic lights catenary (wood) a list of what needs attention
Installation of traffic lights catenary (wood) a list of what needs attention
Author:Shenzhen ZhongAn Traffic Technology Co., Ltd     Time:2016/6/12 15:08:09     Click:191
1. Check the vertical support required hole position, depth and diameter.
2. detect vertical or adjust vertical support. Backfill compaction test status.
3. Detection of cable anchor position.
4. supervise each anchor cable installation, determine the installation execution program consistent with the manufacturer's installation. Since the condition for underground installation method or vendor may not satisfy the conditions of minimum load bolt or bolts for all load test.
5. Check all cables vertical support hardware installation. In the pedestrian zone to ensure the cable hardware vertical or horizontal clearance.
6. Check the vertical support install all horizontal catenary, transmission lines and range lines. Confirm the location of compression insulator
7. Check the traffic lights, traffic signals across cables and transmission line installation. Confirm the minimum height above the road surface than the standard required by temporary means.
上杭县| 桂林市| 上林县| 金寨县| 犍为县| 灵台县| 韩城市| 会同县| 铜川市| 都昌县| 遵化市| 肥乡县| 昭觉县| 星座| 高雄县| 石门县| 磐安县| 永康市| 余庆县| 桑日县| 镇坪县| 刚察县| 涟水县| 弥勒县| 北海市| 禄丰县| 龙川县| 得荣县| 长葛市| 乐都县| 灵璧县| 阳东县| 虎林市| 太原市| 汉源县| 九龙县| 尼勒克县| 抚松县| 宁蒗| 舟山市| 绵竹市|